| |
Automating JK Molds |
|
| |
|
|
| |
After the part and electrode data are taken
from the coodinate measuring machine, The electrodes and parts are
loaded onto the System 3R Robot. |
|
| |
| Pallet with parts being loaded onto the 3R carousel. |
 |
|
|
| |
Pallet gets loaded onto the machine and the
work coordinate positions are automatically created. |
|
| |
|
|
| |
|
|
| |
|
|
| |
Indicating Parts and Setting Electrode offsets
are completely automated. |
|
| |
|
|